March 2021

Office and Meeting Room built out over two weeks. Job consisted of drywall construction, painting, fixed glass installation, frameless glass door and lighting installation.

Restricted working hours and sourcing of frameless glass hinges and locks in the UK shipped, arrived and installed within one week. 

Project completed ahead of time despite shipping challenges due to the flight restrictions during the pandemic.

Details

November 2020 to January 2021

Overall renovation of existing building consisting of but not limited to interior, exterior painting, civil repairs, electrical, structural steel fabrication and upgrading of fixtures.

Budget management, rain, restricted working hours to reduce impact on staff and customers (operations).

Completed project ahead of time with extensive rainfall experienced.

Details

May 2021

Painting, carpentry repairs, electrical, external and internal branding.

Restricted working hours and aggressive timeliness

Completed within schedule, No Accidents and within Budget

Details

Plant Beautification Project – Painting, Aluminum Facade Sourcing, Importing and Installation.  

December 2018 to March 2019

Building Painting, repairs and installation of Aluminium Facade installation.

Rain, restricted working hours, keen execution reduce impact on staff and customers. 

Completed project ahead of time despite extensive rains experienced during project period. 

Details

12,616 sq ft. 

December 2019 to April 2020

Overall Renovation of existing Office Administrative building to include but not limited to demolition, construction, electrical, and air conditioning upgrade, painting and modernize space to match current requirement. 

Budget Management, coordination between contractors, stakeholders and reduce impact on staff.

Significant savings through aggressive negotiations and competitive tendering. 

Details

3200m2 or 34,400sq. ft

December 2018 to August 2019

Piling Foundation, 251 Black Iron Pipe, 8″ concrete floor slab, metal members, galvanize sheeting, ramps and openings to existing warehouses, LED electrical system and Fire detection and fighting equipment.  

Overseas team of 50 persons, ensure compliance of high safety standards, manage timeliness and budget, conduct construction during operations. 

Completed within schedule. No Accidents and within Budget. 

Details

Installation of One-Way Bottle Production Line

September 2016 to December 2017

End to End Supply Chain planning, product development, material sourcing, equipment sourcing, tiling building expansion, mechanical, electrical and civil engineering.

Oversea team of seventy (70) persons, eight (8) nationality, language barrier, strict timelines, high expectation and product development.

Completed within schedule, FAT > 90%. No Accidents and savings in excess Euro €1.